Bad Kreuznach, Germany

Michelin tire plants

Power supply from the public grid and process steam via boiler system

Goal
Energy-efficient supply of steam and electricity to the tire plants


Solution
Operational management by Iqony, renewal of energy generation

  • Gas turbine with 10 MWel and waste heat boiler
  • Takeover of the operating team


Results

  • Investment: € 10 million
  • Savings: 1 million €/a
  • CO2 savings: 7,000 t/a


Impact
Energy saving, cost reduction, integration of the old system

Generation

Electricity72,000 MWh/a
Steam167,000 MWh/a