Duisburg, Germany

HKW III Wanheimerort

Conversion of an existing fossil-fuel power and heat generation system

Goal
New Power & Heat Hub for Duisburg


Solution
Construction of a new energy supply system

  • Large flow water heat pumps 60 MWth 
  • H2-ready gas engines 80 MWel, 100 MWth
  • Electric hot water generator 60 MWth 
  • Battery storage 12 MWel


Results

  • CAPEX: € 200 million
  • CO2 savings: > 1,000,000 t/a


Impact
Decarbonization of the site in 2029, Improving energy efficiency, reducing costs

Generation from 2029

Green electricity300,000 MWh/a
Green heat200,000 MWh/a
Base