Skip to main content

Gelsenkirchen-Scholven, Germany

BP refinery

Replacement of the existing systems

Goal
Fuel switch from coal to gas and reduction of CO2 emissions


Solution
Construction and maintenance of 4 new high-pressure steam boilers and the 3-line water and condensate treatment system

  • Optimized life cycle cost


Results
CO2 savings: approx. 180,000 t/a


Impact
Increasing efficiency, cutting costs, reducing CO2 emissions

Installed power

Steam generation2 x 140 t/h
2 x 120 t/h
Water treatment3 x 220 m3/h
Condensate treatment3 x 300 m3/h
Base